Reports

Snowy Mountains Engineering Corporation (1976), Parramatta River Basin Drainage Study, prepared for Sydney Western Regional Organisation of Local Authorities, 151 pp., September. (Wrote software to compute estimates of steady state flood profiles and prepared flood damage estimates.)

Snowy Mountains Engineering Corporation (1976), Merri Creek Flood Mitigation Project, prepared for Melbourne and Metropolitan Board of Works, 3 volumes, December. (Wrote software to compute estimates of steady state flood profiles and prepared flood damage estimates.)

Snowy Mountains Engineering Corporation (1977), Mathematical Model of the Hydrologic Regime of Upper Nile Basin, Africa, prepared for the World Meteorological Organisation (WMO). (Wrote lake water balance model, contributed to simulations using the Sacramento Model, and assisted in developement of a Hydraulic Streamflow Routing (HSFR) model to solve the St Venant equations in one-dimensional channels.)

Snowy Mountains Engineering Corporation (1977), Terengganu River Basin Study, Malaysia. (Extended HSFR for a network of connected one-dimensional channels.)

Snowy Mountains Engineering Corporation (1977), The Development of Computer Storage System for Hydrometeorological Data, for Bougainville Copper Limited, New Guinea. (Prepared formal software design documents.)

Wilson, J.L., Townley, L.R., and Sa da Costa, A. (1979), Mathematical Development and Verification of a Finite Element Aquifer Flow Model AQUIFEM-1, Technical Report No. 248, Ralph M. Parsons Laboratory for Water Resources and Hydrodynamics, M.I.T., 114 pp.

Townley, L.R. and Wilson, J.L. (1980), Description of and User's Manual for a Finite Element Aquifer Flow Model AQUIFEM-1, Technical Report No. 252, Ralph M. Parsons Laboratory for Water Resources and Hydrodynamics, M.I.T., 294 pp.

Townley, L.R., and Wilson, J.L. (1984), CERT Documentation and Users' Manual, Open-file report at the New Mexico Institute of Mining and Technology, Hydrology Program, Socorro NM, 276 pp.

Loneragan, W.A., McMillan, R.P., Townley, L.R., and Watson, L.E. (1984), Star Swamp Bushland Reserve, Proposals for its Development and Management, Report to the Australian Heritage Commission, 125 pp.

Cargeeg, G.C., Boughton, G.N., Townley, L.R., Smith, G.R, Appleyard, S.J., and Smith, R.A. (1987a), The Perth Urban Water Balance Study, Executive Summary, Water Authority of Western Australia Report and UWA Environmental Dynamics Reference ED-86-192, 20pp.

Cargeeg, G.C., Boughton, G.N., Townley, L.R., Smith, G.R, Appleyard, S.J., and Smith, R.A. (1987b), The Perth Urban Water Balance Study, Volume 1 - Findings, Water Authority of Western Australia Report and UWA Environmental Dynamics Reference ED-86-176, 128pp.

Cargeeg, G.C., Boughton, G.N., Townley, L.R., Smith, G.R, Appleyard, S.J., and Smith, R.A. (1987c), The Perth Urban Water Balance Study, Volume 2 - Data Collection and Analysis Techniques, Water Authority of Western Australia Report and UWA Environmental Dynamics Reference ED-87-190, 124pp.

Nield, S.P., and Townley, L.R. (1987), Study of Water Levels in the Capel Wetlands, UWA Environmental Dynamics Reference WP-87-034, 25 pp., August 1987; also published as AMC Wetlands Centre Technical Report No.6.

Townley, L.R., Rainford, H.J., Sander, G.C., and Bligh, K.J. (1987), Field Measurements and Modelling of Rainfall-Runoff and Soil Erosion at Berkshire Valley, W.A., UWA Environmental Dynamics Report ED-87-200, 95pp.

Townley, L.R. (1987), AQUIFEM-N: A Multi-Layered Finite Element Aquifer Flow Model: User's Manual and Description, Townley and Associates.

Townley, L.R. (1988), Estimate of Underseepage for Proposed Tailings Dam, Longos Point, prepared for BHP Engineering Pty Ltd, CSIRO Division of Water Resources, 14 pp., March.

Townley, L.R. (1990), GOLDPLOT: a system for plotting Golder output on PCs, CSIRO Division of Water Resources, Consultancy Report, 8pp.

Townley, L.R., Barr, A.D., Johnston, C.D., and Salama, R.B. (1990), Hydrologic and process modelling of solar salt production at Useless Inlet and Useless Loop, W.A., CSIRO Division of Water Resources, Consultancy Report, 125pp. [Confidential]

Townley, L.R., Turner, J.V., Nield, S.P., Barr, A.D., Wright, K.D., Harris, C.J., and Gailitis, V. (1990), Interaction between lakes, wetlands and aquifers: Progress between January 1989 and February 1990, CSIRO Division of Water Resources, Consultancy Report, 47pp.

Townley, L.R., Turner, J.V., Barr, A.D., Trefry, M.G., Wright, K.D., Harris, C.J., and Gailitis, V. (1990), Interaction between lakes, wetlands and aquifers: Progress between March and November 1990, CSIRO Division of Water Resources, Consultancy Report, 40pp. plus Appendices.

Townley, L.R., and Trefry, M.G. (1991), Two- and three-dimensional modelling of groundwater flow through the Koongarra uranium orebody, IN: Alligator Rivers Analogue Project, 2nd Annual Report 1989-90, ANSTO, 115-132.

Barr, A.D., and Townley, L.R. (1991), SALTPROD: a program that simulates the flow of water and salt through a system of evaporation ponds, CSIRO Division of Water Resources, Consultancy Report 91/4, 58pp., plus software. [Confidential]

Turner, J.V., Rosen, M.R., and Townley, L.R. (1991), Fourth Quarterly Report to MERIWA and AMIRA for the period April 1991 to June 1991, on Groundwater recharge studies - Kalgoorlie region, Project M146/P321, CSIRO Division of Water Resources, Consultancy Report, 27pp.

Townley, L.R., Barr, A.D., and Nield, S.P. (1992), FlowThru: An Interactive Program for Calculating Groundwater Flow Regimes Near Shallow Surface Water Bodies, CSIRO Division of Water Resources, Technical Memorandum 92/1, Version 1.0, February, 27pp. [A revised Version 1.2 of this report was released in August 1994, and is available for download.]

Townley, L.R., and Barr, A.D. (1992), Two-dimensional regional groundwater flow near Koongarra, IN: Alligator Rivers Analogue Project, 3rd Annual Report 1990-91, ANSTO, 165-193.

Townley, L.R., Barr, A.D., and Nield, S.P. (1992), FlowThru: An Interactive Program for Calculating Groundwater Flow Regimes Near Shallow Surface Water Bodies, CSIRO Division of Water Resources, Technical Memorandum 92/1, Version 1.1, November, 85pp., plus software. [A revised Version 1.2 of this report was released in August 1994, and is available for download.]

Duerden, P., Lever, D.A., Sverjensky, D.A, and Townley, L.R. (1992), Alligator Rivers Analogue Project Final Report, Volume 1, Summary of Findings, ANSTO, Lucas Heights, N.S.W., Australia, 138pp.

Townley, L.R., Barr, A.D., Braumiller, S., Kawanashi, M., Lever, D.A., Miyakawa, K., Morris, S.T., Raffensperger, J.P., Smoot, J.L., Tanaka, Y., and Trefry, M.G. (1992), Alligator Rivers Analogue Project Final Report, Volume 6, Hydrogeological Modelling, ANSTO, Lucas Heights, N.S.W., Australia, 133pp.

Townley, L.R., Turner, J.V., Barr, A.D., Trefry, M.G., Wright, K.D., Gailitis, V., Harris, C.J., and Johnston, C.D. (1993), Interaction between lakes, wetlands and aquifers, CSIRO Division of Water Resources, Consultancy Report 93/1, 469pp.

Townley, L.R., Turner, J.V., Barr, A.D., Trefry, M.G., Wright, K.D., Gailitis, V., Harris, C.J., and Johnston, C.D. (1993), Interaction between lakes, wetlands and aquifers: Final Report to Land and Water Resources Research and Development Corporation, CSIRO Division of Water Resources, Consultancy Report 93/11, 7pp.

Townley, L.R. (1993), AQUIFEM-P: A Periodic Finite Element Aquifer Flow Model: User's Manual and Description, Version 1.0, CSIRO Division of Water Resources, Technical Memorandum 93/13, 72pp., plus software.

Lee, H.W.J., Townley, L.R., and Goh, C.J. (1993), Optimal control of the solar salt production process. CSIRO Division of Water Resources, Technical Memorandum 93/14, 45pp.

Richards, B.G., and Townley, L.R. (1993), New Celebration tailings dams, Preliminary report to Newcrest Mining Ltd, CSIRO Minesite Rehabilitation Research Program, 12pp., May 1993. [Confidential]

Turner, J., Rosen, M., Milligan, N., Sklash, M., and Townley, L. (1993), Groundwater recharge studies in the Kalgoorlie region. Minerals and Energy Research Institute of Western Australia, Report No.98, 276pp.

Townley, L.R., and Chapman, B.M. (1993), Hydrogeological and hydrogeochemical implications of flooding the Enterprise Pit, Confidential report to Energy Resources of Australia Ltd, CSIRO Minesite Rehabilitation Research Program, 37pp., July 1993. [Confidential]

Townley, L.R., and Barr, A.D. (1993), Coupled water balance modelling of Tom's Dam and the Enterprise Pit, Confidential report to Energy Resources of Australia Ltd, CSIRO Minesite Rehabilitation Research Program, 23pp., September 1993. [Confidential]

Townley, L.R., and Fleming, P.M. (1993), Hydrologic overview of the Shoalwater Bay region - with special emphasis on the eastern dune fields. Report to the Commonwealth Commission of Inquiry, Shoalwater Bay, Capricornia Coast, Queensland. CSIRO Division of Water Resources, Consultancy Report 93/30, 86pp., October 1993.

Meyer, T.G.H., Peter, P., Richards, B.G., and Townley, L. (1993), New Celebration tailings dams, Final report to Newcrest Mining Ltd, CSIRO Minesite Rehabilitation Research Program, 41pp., November 1993. [Confidential]

Turner, J.V., and Townley, L.R. (1993), Groundwater - lake water interactions near Lake Jasper, D'Entrecasteaux National Park, Western Australia. First half-yearly report to Cable Sands (WA) Pty Ltd for the period May to October 1993. CSIRO Division of Water Resources, Consultancy Report 93/39, 59pp., December 1993. [Confidential]

Townley, L.R., Turner, J.V., Barr, A.D., Trefry, M.G., Wright, K.D., Gailitis, V., Harris, C.J., and Johnston, C.D. (1993), Wetlands of the Swan Coastal Plain, Volume 3, Interaction between lakes, wetlands and aquifers, Water Authority of Western Australia, 115pp.

Jones, D.R., and Townley, L.R. (1994), Hydrological and water quality consequences of closure of the tailings dam at the Lucky Draw Mine, Burraga, NSW, Report to Renison Goldfields Consolidated, CSIRO Minesite Rehabilitation Research Program, 35pp., January 1994. [Confidential]

Townley, L., and Swanson, T. (1994), Section 9: Water Balance, IN: Notes for a Course on Mine Residue Management, Australian Centre for Geomechanics, 24-25 February 1994, Perth, 10pp. [Confidential]

Turner, J.V., and Townley, L.R. (1994), Groundwater - lake water interactions near Lake Jasper, D'Entrecasteaux National Park, Western Australia. Second half-yearly report to Cable Sands (WA) Pty Ltd for the period November 1993 to May 1994. CSIRO Division of Water Resources, Consultancy Report 94/19, 35pp., June. [Confidential]

Turner, J.V., Townley, L.R., and Barr, A.D. (1994), Progress Report to MERIWA and AMIRA for the period January to June 1994, on Groundwater Supply to the Mining Industry on the WA Goldfields, Project M217/P321A, CSIRO Division of Water Resources, Consultancy Report, 64pp.

Townley, L.R., Barr, A.D., and Nield, S.P. (1994), FlowThru: An Interactive Program for Calculating Groundwater Flow Regimes Near Shallow Surface Water Bodies, CSIRO Division of Water Resources, Technical Memorandum 92/1, Version 1.2, August, 80pp.

Townley, L.R., and Barr, A.D. (1994), Flow characteristics of the Enterprise Lake system, Stage I, Prepared for Energy Resources of Australia Ltd, CSIRO Minesite Rehabilitation Research Program, 27pp., October. [Confidential]

Townley, L.R., Turner, J.V., Otto, C.J., Barr, A.D., Frape, S.K., Nield, S.P., Hingston, F.J., Farrington, P., Wright, K.D., Galbraith, J.H., Watson, G.D., Gailitis, V., and Woodbury, R.J. (1995), Groundwater contamination near Baldivis tailings pond, Final Report to Western Mining Corporation Ltd, Kwinana Nickel Refinery, CSIRO Division of Water Resources Consultancy Report No. 95/6, 392pp., April. [Confidential]

Townley, L.R. (1995), Review of regional groundwater modelling for the Cannington Project, Report to BHP Minerals Pty Ltd, CSIRO Division of Water Resources Consultancy Report No. 95/7, 16pp., February. [Confidential]

Turner, J.V., Townley, L.R., Barr, A.D., and Woodbury, R.J. (1995), Groundwater - lake water interactions near Lake Jasper, D'Entrecasteaux National Park, Western Australia. Third half-yearly report to Cable Sands (WA) Pty Ltd for the period May 1994 to November 1994. CSIRO Division of Water Resources, Consultancy Report 95/8, 37pp., January. [Confidential]

Townley, L.R., Ellerbroek, D.A., Wei, Y., Sheng, Y., Jones, D.R., Eames, J.C., Peter, P., and Soole, P. (1995), BHPAC Spoil Hydrology project, Progress by CSIRO to 31 May 1995, Progress report to BHPAC, CSIRO Minesite Rehabilitation Research Program, 90pp., May. [Confidential]

Townley, L.R., Turner, J.V., Rich, J.F., and Wright, K.D. (1995), Preliminary report on the groundwater hydrology of Perry Lakes, prepared for the Town of Cambridge, CSIRO Division of Water Resources Consultancy Report No. 95/27, 61pp., August.

Townley, L.R., and Ellerbroek, D.A. (1995), Review of hydrological data at Possum Pit, Progress report to Rust PPK, CSIRO Minesite Rehabilitation Research Program, 14pp., August. [Confidential]

Turner, J.V., Barr, A.D., Challen, R.P., Johnson, S.L., Townley, L.R., Wright, K.D., Woodbury, R.J., Watson, G.R., Bartle, G.A., and Gailitis, V. (1995), Groundwater supply to the mining industry in the WA goldfields, Final report on research carried out as MERIWA Project M217 and AMIRA Project P321A, CSIRO Division of Water Resources, 302pp., September.

Townley, L.R., and Ellerbroek, D.A. (1995), BHPAC Spoil Hydrology Project: Water movement in the Possum Pit transect, prepared for Rust PPK, CSIRO Minesite Rehabilitation Research Program, 52pp. September. [Confidential]

Townley, L.R. (1995), Groundwater flow and contaminant transport: Water leakage at Olympic Dam, Report to the Environment, Resources and Development Committee of the Parliament of South Australia, CSIRO Division of Water Resources Consultancy Report No. 95/39, 24pp., October. [Confidential]

Otto, C.J., Townley, L.R., Bartle, G.R., and Watson, G.D. (1995), Dual pump recovery tests at the Baldivis Kwinana Nickel Refinery tailings pond, Report to WMC Kwinana Nickel Refinery, CSIRO Division of Water Resources Consultancy Report No. 95/43, 22pp., November. [Confidential]

Barr, A.D., Townley, L.R., and Turner, J.V. (1995), Estimated concentrations of calcium, ammonium sulphate and chloride in recovered groundwater near Baldivis tailings pond, Report to WMC Kwinana Nickel Refinery, CSIRO Division of Water Resources Consultancy Report No. 95/44, 39pp., November. [Confidential]

Townley, L.R. (1996), Review of previous studies of seepage from Ranger tailings dam, CSIRO Minesite Rehabilitation Research Program, 68pp., February. [Confidential]

Turner, J.V., Barr, A.D., Challen, R.P., Johnson, S.L., Townley, L.R., Wright, K.D., Woodbury, R.J., Watson, G.D., Bartle, G.A., and Gailitis, V. (1996), Groundwater supply to the mining industry in the WA goldfields. Minerals and Energy Research Institute of Western Australia. Report No. 154, 292 pp.

Turner, J.V., Townley, L.R., Barr, A.D., Linderfelt, W.R., Woodbury, R.J., Gailitis, V., Bartle, G.A., and Watson G.D. (1996), Groundwater - lake water interactions near Lake Jasper, D'Entrecasteaux National Park, Western Australia, Draft final report to Cable Sands (WA) Pty Ltd, CSIRO Division of Water Resources Consultancy Report No. 96/15, 210 pp., June. [Confidential]

Trefry, M.G., and Townley, L.R. (1996), Tools for empirical analysis of steady flux fields: PTRACK and STREAMv2.0. CSIRO Division of Water Resources Technical Memorandum 96/13, 64pp., June.

Otto, C.J., Townley, L.R., Bartle, G.R., and Watson, G.D. (1996), Dual pump recovery tests in one bore at the Baldivis Kwinana Nickel Refinery tailings pond, Report to WMC Kwinana Nickel Refinery, CSIRO Division of Water Resources Consultancy Report No. 96/33, 25pp., September. [Confidential]

Townley, L.R., and Barr, A.D. (1996), Modelling of improved recovery of a dense plume near the Baldivis tailings pond using adaptive dual pump recovery (DPR) bores, Report to WMC Kwinana Nickel Refinery, CSIRO Division of Water Resources Consultancy Report No. 96/39, 47pp., December. [Confidential]

Otto, C.J., Townley, L.R., and Watson, G.D. (1997), Two dual pump recovery tests in single bores at the Kwinana Nickel Refinery, Report to WMC Kwinana Nickel Refinery, CSIRO Division of Water Resources Consultancy Report No. 96/63, 11pp., March. [Confidential]

Townley, L.R., Herne, D.E, and Byrne, J.D. (1997), Hydrological boundaries near Twin Swamps Reserve and Ellen Brook Nature Reserve, Report to Department of Environmental Protection, Western Australia, CSIRO Division of Water Resources Consultancy Report No. 96/64, 12pp., April. [Confidential]

Townley, L.R. (1997), WMC Olympic Dam expansion EIS: Preview of draft chapter on tailings management, Report to Kinhill Engineers Pty Ltd, CSIRO Land and Water Consultancy Report No. 97-8, 10pp., April. [Confidential]

Townley, L.R., and Barr, A.D. (1997), Estimated concentrations of calcium, ammonium sulphate, and sodium chloride in groundwater recovered near the Baldivis tailings pond using adaptive dual pump recovery (DPR) bores, Report to WMC Kwinana Nickel Refinery, CSIRO Land and Water Consultancy Report No. 97-9, 40pp., May. [Confidential]

Turner, J.V., and Townley, L.R. (1997), Status of the contaminant plume near the Baldivis tailings pond, 1994-1996, Report to WMC Kwinana Nickel Refinery, CSIRO Land and Water Consultancy Report No. 97-13, 15pp., May. [Confidential]

Linderfelt, W.G., Turner, J.V., Townley, L.R., Bartle, G.A., Watson, G.D., and Woodbury, R.J. (1997), Interaction between shallow groundwaters and saline surface water in a seasonal estuary: The Swan River System, Progress report (1996-1997) prepared for the Western Australian Estuarine Reseach Foundation, CSIRO Land and Water, 19pp., August. [Confidential]

Otto, C.J., Townley, L.R., and Barr, A.D. (1997), Design of adaptive dual pump recovery (DPR) systems near the Baldivis tailings pond, Report to WMC Kwinana Nickel Refinery, CSIRO Land and Water Consultancy Report No. 97/30, 16pp., September. [Confidential]

Quartz Water Australia (1998), EIS for the proposed Marlborough Nickel Project, for Preston Resources Limited, ??pp.

Quartz Water Australia Pty Ltd and Martinick McNulty Pty Ltd (1999), Ashburton Gold Project, Notice of Intent with Technical Certification, M08/99, M08/196, L08/12, L08/13, L08/14 and G08/50, submitted to Department of Minerals and Energy, Western Australia, by Taipan Resources NL, 85 pp. plus Figures, September.

International Advisory Committee (IAC) (1998), The Radiological Situation in the Atolls of Mururoa and Fangataufa, Main Report, Radiological Assessments Reports Series No. STI/PUB/1028 | 92-0-101198-9, International Atomic Energy Agency (IAEA), Vienna, 282 pp. [The members of Working Group 4 (Geosphere radionuclide transport) of Task Group B (Evaluation of potential long term radiological situation) who contributed to Section 6 of the Main Report were Fairhurst, C., de Marsily, G., Hadermann, J., Nitsche, H., Sastratenaya, A.S., and Townley, L.] The Main Report is available online.

International Advisory Committee (IAC) Working Group 4 (1998), The Radiological Situation in the Atolls of Mururoa and Fangataufa, Technical Report, Volume 4, Releases to the Biosphere of Radionuclides from Underground Nuclear Weapon Tests at the Atolls, International Atomic Energy Agency (IAEA), Vienna, 270 pp. [The Members of Working Group 4 (Geosphere radionuclide transport) of Task Group B (Evaluation of potential long term radiological situation) were Fairhurst, C., de Marsily, G., Hadermann, J., Nitsche, H., Sastratenaya, A.S., and Townley, L.]

Fairhurst, C., Brown, E.T., Detournay, E., de Marsily, G., Nikolaevskiy, V., Pearson, J.R.A, Townley, L., and Berest, P. (1999), Underground Nuclear Testing in French Polynesia, Stability and Hydrology Issues, International Geomechanical Commission (IGC), A report in three volumes: Volume I, General Results; Volume II, Technical Analyses, and Volume III, Les Essaies Nucléaires Souterrains en Polynésie Française: Stabilité et Hydrogéologie (French language extracts from Volumes I and II), La Documentation Française, Paris, France, 766 pp. in combined PDF.

Jewell, R.J., and Townley, L.R. (Eds) (1999), A scoping study for the definition of research needs for the management and rehabilitation of tailings disposal facilities, AMIRA Project P484, Australian Centre for Minesite Environmental Research, 254pp., June.

Townley, L.R. (1999), Projet New Caledonia Nickel, Etude Préliminaire de Faisibilité, soumise à la Province Nord de la Nouvelle-Calédonie, établie par Argosy Minerals Inc., prepared by Townley & Associates Pty Ltd, ??pp., Octobre.

Townley, L.R. (2000), Elizabeth River Recreational Waterway Study, Distribution of salinity in reservoir, prepared for EWL Sciences Pty Ltd, by Townley & Associates Pty Ltd, 20 pp., January.

Townley, L.R. (2000), Golden Pride Project, Tanzania, for Resolute Resources Ltd, by Townley & Associates Pty Ltd, ??pp.

Townley, L.R. (2000), Simulation of water supply aquifers at Depot Springs, for Anaconda Nickel Ltd, by Townley & Associates Pty Ltd, ??pp.

Townley, L.R. (2000), Mt Garnet Project, Initial Advice Statement, PJ 20046, submitted to Queensland Department of Mines and Energy by Kagara Zinc Ltd, prepared by Townley & Associates Pty Ltd, 21 pp., 9 February.

Townley, L.R. (2000), Mt Garnet Zinc Project, Environmental Management Overview Strategy, PJ 20046/30011, submitted to Queensland Department of Mines and Energy by Kagara Zinc Ltd, prepared by Townley & Associates Pty Ltd, 60 pp., December.

Townley, L.R. (2001), Mt Garnet Zinc Project, Water Quality in Final Voids, prepared for Kagara Zinc Ltd, by Townley & Associates Pty Ltd, 15 pp., 15 August.

Townley, L.R. (2001), Optimal recovery of dense caustic soda plume at Kwinaan Tailings Ponds, for Alcoa World Alumina, by Townley & Associates Pty Ltd, ??pp.

Townley, L.R. (2001), White Foil Gold Project, Mine dewatering and injection studies, prepared for Mines and Resources Australia Pty Ltd, by Townley & Associates Pty Ltd, ??pp., January.

Townley, L.R. (2001), New Caledonia Nickel Project, prepared for Argosy Minerals Inc., by Townley & Associates Pty Ltd, ??pp.

Townley, L.R. (2001), Impact of hypersaline discharge to the surface of Lake Carey, prepared for Sons of Gwalia and AngloGold Ltd, by Townley & Associates Pty Ltd, ??pp.

Townley, L.R. (2002), Frog's Leg Gold Project, Notice of Intent with Technical Certification, M15/688 and M15/1407, submitted to Department of Mineral and Petroleum Resources, Western Australia, by Mines and Resources Australia Pty Ltd, on behalf of Mungari East Joint Venture, prepared by Townley & Associates Pty Ltd, ??pp., December.

Townley, L.R. (2002), Review/Audit of Rehabiliation Liabilities, prepared for Bulong Nickel Operations, by Townley & Associates Pty Ltd, ??pp.

Townley, L.R. (2002), Audit and technical review of rehabiliation and progress towards closure of BHP Billiton's Beenup Mineral Sands Project, prepared for Beenup Consultative Group, by Townley & Associates Pty Ltd, ??pp.

Townley, L.R. (2003), Proposed Pipeline from Frog's Leg to White Foil for Dewatering Discharge, Notice of Intent with Technical Certification, M15/688, L15/246, L16/28, L15/228 and M15/830, submitted to Department of Industry and Resources, Western Australia, by Mines and Resources Australia Pty Ltd, on behalf of Mungari East Joint Venture, prepared by Townley & Associates Pty Ltd, ??pp., October.

NTEC Environmental Technology (2003), Railway tunnel, for Worley Parsons, for Perth Transport Authority, ??pp.

NTEC Environmental Technology (2004), Cockatoo Iron Ore Mine, for Aquaterra, for Portman Mining, ??pp.

NTEC Environmental Technology (2010), South Lemington Mine, ??pp.

Planning Assessment Commission (2010a), Wallarah 2 Coal Project, ??pp.

Planning Assessment Commission (2010b), Bickham Coal Project, ??pp.

NTEC Environmental Technology (2011), United Extension project, for Umwelt Pty Ltd, for Xstrata Coal, ??pp.

NTEC Environmental Technology (2011), Alpha and Kevin's Corner Projects, for JBT Consulting, for Hancock Coal, ??pp.

NTEC Environmental Technology (2011), Bow Gas Project, for Bow Energy, ??pp.

NTEC Environmental Technology (2011), Moranbah Gas Project, for Arrow Energy, ??pp.

NTEC Environmental Technology (2011), Surat Gas Project, for Arrow Energy, ??pp.

Barnett, B., Townley, L.R., Post, V., Evans, R.E., Hunt, R.J., Peeters, L., Richardson, S., Weatherill, D., Werner, A.D., Knapton, A., and Boronkay, A. (2012), Australian Groundwater Modelling Guidelines, Waterlines Report Series No.82, National Water Commission, Canberra, June, 191 pp. [A PDF version of the Guidelines is available online.]

NTEC Environmental Technology (2012), Review of estimates of water production from the Surat Basin, for Hyder Consulting, ??pp.

NTEC Environmental Technology (2012), Gunnedah Gas Project, for Santos Limited, ??pp.

NTEC Environmental Technology (2012), Christmas Creek and Cloudbreak, for Fortescue Metals Group, ??pp.

NTEC Environmental Technology (2012), GoldSim model of Tailings Storage Facility at Mt Garnet, for Kagara Zinc, ??pp.

CDM Smith (Australia) (2013), Rainfall-Runoff and Pit Lake Water balance Model using GoldSim for the Mt Oxide Abandoned Copper Mine, for Queensland Department of Natural Resources and Mines, ??pp.

CDM Smith (Australia) (2014), Sitewide Water Balance of the Kayelekera Uranium Mine in Malawi, for Paladin Energy Ltd, ??pp.

CDM Smith (Australia) (2014), Surat Gas Expansion Project, for Arrow Energy, ??pp.

CDM Smith (Australia) (2014), GoldSim Model to simulate the water balance of the Abbot Point T0 Terminal, for Adani Mining Australia, ??pp.

CDM Smith (Australia) (2015), Narrabri Gas Project, for Santos Limited, ??pp.

CDM Smith (Australia) (2015), Carrapateena Project, for Oz Minerals Limited, ??pp.

CDM Smith (Australia) (2015), Proposed in situ recovery of uranium, for Paladin Energy Limited, ??pp.

CDM Smith (Australia) (2015), Potential Environmental Impact of Proposed Twin Road Tunnel in Sydney, for AECOM, ??pp.

CDM Smith (Australia) (2016), GLNG, Audit of Stage 1 and Stage 2 CSG Water Monitoring and Management Plans (WMMPs) for Santos Limited, ??pp.

CDM Smith (Australia) (2016), Macraes Gold Tungsten project, for OceanaGold, ??pp.

CDM Smith (Australia) (2016), Integrated Water Management Plan for Coliban Water, for Alluvium, ??pp.

Nanjing Smart Technology Development Co. Ltd (2022), Suichang Abandoned Pyrite Mine, ??pp.

Home

Copyright © 2022 by Lloyd Townley
Last revised: 18 January 2022